2020 has truly been a year of challenges at ONC, starting with the ongoing closure of the main building's lower level due to a sewage flood that occurred Dec 11, 2019. After four months of restoration the lower level was open for use in April, just when restrictions pertaining to COVID-19 caused a church shutdown until June. November presented our last challenge of the year (so far) -- closure of the Education Building due to a blocked sewer line. Several men of the church have participated in the continuing attempt to ascertain the location of the blockage. Discovering the location of the pipe is merely the first step. We are grateful for these men who can get things done.